JOHN THE ROOFER, CO.

Roofing in Massachusetts and Rhode Island

  • Process
  • Paul Mainville Bio
  • Gallery
  • News
  • Testimonials
  • FAQ
  • Contact Us

TPO (thermoplastic) Roof

The application of the adhesive to the fiberboard and to the TPO roof membrane
The application of the adhesive to the fiberboard and to the TPO roof membrane
Proof of why you do not shingle a low slope roof and the start of the TPO install .... it was necessary to remove the botton 18 inches of the rotted plywood
Proof of why you do not shingle a low slope roof and the start of the TPO install .... it was necessary to remove the botton 18 inches of the rotted plywood
Proof of why you do not shingle a low slope roof and the start of the TPO install .... it was necessary to remove the botton 18 inches of the rotted plywood
The installation of the fiber adhesion sheathing.
The installation of the fiber adhesion sheathing.
Broom swept to push out any air pockets and to assure complete adhesion.

Connect with Us!

RSS
Follow by Email
Facebook
Facebook
fb-share-icon

John the Roofer Company
4 Bella Rosa Drive
Millbury, MA 01527

MA CSL #97139
MA HIC #111318
RI HIC #258
RI Commercial HIC #44R

John the Roofer Company, Roofing Contractors, Millbury, MA

Certified Drexel Metal Installer

Privacy Policy

Designed by Clearmark Studios · Copyright © 2021 JOHN THE ROOFER, CO. · Built on the Genesis Framework · Log in